Engineering Ideas Put into Practice – Great Article from Desktop Engineering

In the latest BUILD magazine, DTE discusses how helping companies raise design productivity and quality through using 3D software is making advancements in the construction industry of 3D modelling, or BIM methods.

… Using building information modelling to truly represent the design idea or intent of the architect or designer, improves communication through the whole construction supply chain. This enables contractors to bid accurately and de-risk their activity through having detailed 3D information. Thus, the design/build activity, however contracted, is completed on time within budget and to a higher quality.

 

 

Destop Engineeering has been supplying 3D design software and consulting on best methods in markets such as automotive and aerospace, for some time. These industries communicate using 3D data rather than drawings.  The outcome of this approach has been to reduce the lead time from design to manufacture by more than half.

Danjiang Bridge awards for ConstructionSo, it is their vision that construction should complete all design activity in 3D, access it and share it using Cloud technologies and confirm the practicality of construction using simulation software. We supply this capability using Dassault Systemes 3DEXPERIENCE software platform. It meets all the relevant compliancy needs – up to BIM Level 3 using a Cloud web services approach. Supplying software is only one element of the digital transformation that we affect to our clients.

The way the software is used is just as important.  They deliver that knowledge through consulting with  clients, determining where they can make improvements through knowledge of what can be done and applying industry best practice to these methods. They have found that experience we have drawn from our work in the automotive and aerospace industries can be applied to construction. designer, manufacturers and contractors all have similar problems in wanting to manage data – that is creating, storing, sharing and disseminating.

Further, project management control is central to any business activity. All these functions can be applied and use with the 3DEXPERIENCE platform. Our approach in engaging with clients is in the first instance to understand how they currently design for fabrication and construction.

Digitally Built IET LondonThe next step is some trial or evaluation which we would typically base on a small project. Through the trial we train and support at whatever level our client is conformable with, all the while monitoring and managing challenges, expectations and objectives. On completion our clients generally make plans for migration to our software and workflows, typically on a project by project basis, allowing the existing project to run out using their former technologies. During this activity, our team of support consultants are engaged in training and support the expansion within our clients, ensuring a smooth take up.

In this market, we have a clear advantage over other competitor software by meeting the Governments initiative on specified levels of skill and maturity in using BIM methods. They defined three levels, with the first level a very basic capability. The intermediate BIM Level 2 is the where most software applications perform together with architects and contractors currently migrating their processes to meet this requirement.

CATIA 3DEXPERIENCE however, conforms to the highest Level 3 – a true single database of project 3D design information that allows simultaneous access by all involved. No other software application at this moment can offer this.

The future of the construction industry depends on all involved gaining enough profitable business. Currently, the margins that some contractors work on does not reflect the risk they take on. This risk can only be controlled or mitigated through having clarity from their client on what the project entails, with as much detail offered so that project costs can be accurately forecast and then controlled during construction. Our approach of delivering that information can only help in taking out the uncertainty that imprecise drawings or specifications give. Our aim in moving forward is to demonstrate clear gains from projects that we have currently in place with some leading enlightened contractors. Through this viral approach, we hope that we engage in more forwarding looking clients.”